Skip to main content

PoolParty Data Validator

Abstract

PoolParty Data Validator

The PoolParty Data Validator performs various checks on PoolParty data. It is available for every import of RDF or tabular, spreadsheet or CSV data, if you have activated the corresponding checkbox during import. Data checked by the Data Validator has to be stored in a separate step of the project. Until that point such data will only be available in the Data Validator. Other changes to the project are not possible as long as such data has not been saved.

For more details refer to:

Access the PoolParty Data Validator

To access the Data Validator in your opened PoolParty project, follow the steps below.

Note

We strongly recommend that you create a manual snapshot of the project before you start data validation.

  1. In the projects Details View click Quality Management.

  2. Select the Data Validator.

  3. Click Start in Validate Existing Project Data.

The Data Validator offers numerous functions. These functions are described below.

Note

After you have started the validation process, additional information will be displayed and additional functionality will be available.

1105-Access-the-PoolParty-Data-Validator.png

Data Validator Functions

Recheck

Data-Validator---Recheck.png

Clicking this button (1) triggers checks performed by the Data Validator. The Data Validator checks for:

  • data compliance with RDF and SKOS standards

  • compliance with PoolParty Semantic Suite's standards

  • Excel data compliance with the PoolParty Excel format

Note

Using this button will display a dialog window with a progress bar indicating the status of the respective check.

Automatic snapshot function

The automatic snapshot function provides a backup of your project and is triggered:

  • before saving data in a data validation run

  • when closing a project

  • in line with the Auto Save Interval

Save

Data-Validator---Save-as.png

After you have repaired or deleted all affected data, you can save it (1).

Warning

You cannot make any changes to your project (e.g. SKOS conversions, concept linking) as long as you are using the Data Validator and have not finalized the validation by saving the repairs or canceling the entire process.

Tip

For details on how to repair data refer to Data Validator - Results and Repair Functions.